"Golden Bridge" Project Area Operations Center


The front-line control and coordination center for the Golden Bridge project, operating on both sides of the ocean:


Andaman Side Operations Center (Ranong):

Controls and manages the supporting industrial estate, floating dock (Phase 1), oil and gas storage facilities on the B, C zones, and the FSO/FSRU control unit on the inbound side (Phase 2)

Thailand Bay Operations Center (Chumphon):

Controls and manages the 98 km trans-strait pipeline system, twin energy storage facilities (Mirror Site), Green Data Center project, and the outbound goods distribution center to the Pacific (Phase 3)